4.2.2 Contractor testing. When the contractor is responsible for conduc-
ting first article approval tests, the sample shall be inspected by the con-
tractor for all the requirements of the contract. The sample and a record of
this inspection, including certificates of conformance for materials shall be
submitted to the Government for approval. The Government reserves the right
to witness the contractor's inspection.
4.3 Inspection provisions.
4.3.1 Submission of product. Unless otherwise specified by the contrac-
ting officer, inspection lot size, lot formation and presentation of lots
shall be in accordance with "Submission of Product" provisions of MIL-STD-105.
4.3.2 Examination and tests.
4.3.2.1 Components and subassemblies. All components and subassemblies
shall be inspected in accordance with the inspection provisions contained in
Supplementary Quality Assurance Provisions (SQAP) listed in the Technical Data
Package (TDP). In the absence of SQAP's the applicable Quality Assurance
Provisions of MIL-F-13926 shall apply. Examination and tests related to Sec-
tion 3 herein shall be performed on a single defect (individual
characteristic) basis in accordance with MIL-STD-105 and the sampling plans
specified in Tables I, II and III herein. Examination and tests for
packaging, packing, and marking shall be in accordance with MIL-P-14232 and
Section 5 herein. The tabulated classification of defects shall constitute
the minimum inspection to be performed by the supplier after first article
approval and prior to Government acceptance or rejection by item or lot.
TABLE I - CLASSIFICATION OF DEFECTS
REQUIREMENTS
TEST PROCEDURE
CLASS
CHARACTERISTIC
CRITICAL: NONE
MAJOR: AQL 0.65%
101.
Line of sight, orientation,
4.6.3
3.9
pre-vibration
4.6.4, 4.6.6
3.9
102.
Vibration
103.
Line of sight retention,
4.6.5
3.9
post-vibration
4.6.7
3.10
104.
Dielectric strength
105.
Luminous transmittance, head
4.6.8.7
3.11.3a
assembly
4.6.8.8
3.11.3b
Resolution, head assembly
106.
4.6.8.13
3.11.6
107.
Resolution, unity power system
4.6.10.1
3.12.2.1
108.
Cleanliness, head assembly
4.6.10.2
3.12.2.2
Cleanliness, unity power system
109.
110.
Cleanliness, nine power system
4.6.10.3
3.12.2.3a
tube installed
111.
Cleanliness, nine power system
4.6.10.4
3.12.2.3b
tube removed