|
| MIL-PRF-62365C(AT)
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number. and date of this specification.
b. Issue of DoDISS to be cited in the solicitation, and if required, the specific issue of
individual documents referenced (see 2.2.1 and 2.3).
c. If first article is required (see 3.1).
d. If inspection conditions are other than as specified (see 4.2).
e. If preproduction inspection is required (see 4.3.1).
f. If initial production inspection is not required (see 4.3.2).
g. Packaging requirements (see 5.1).
6.3 Subject term (key word) listing.
Differential pressure
Displacement per revolution
Fixed displacement
M901A1
Volumetric displacement
6.4 Changes from previous issue. Marginal notations are not used in this revision to
identify changes with respect to the previous issue due to the extent of the changes.
6.5 Sampling. Sampling, if required, should be specified in the contract.
Custodian:
Preparing Activity:
Army - AT
Army - AT
(Project 2590-A023)
18
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |