Click here to make tpub.com your Home Page

Page Title: Alternate inspection provisions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-P-70679 (AR)
All items must meet all
4.1.1 Responsibility for compliance.
requirements of section 3 and 5.  The inspections set forth in
this specification shall become a part of the contractor's overall
inspection system or quality program.  The absence of any
inspection requirements in the specification shall not relieve the
contractor of the responsibility of assuring that all products or
supplies submitted to the Government for acceptance comply with
all requirements of the contract.  Sampling in quality conformance
does not authorize submission of known defective material, either
indicated or actual, nor does it commit the Government to
acceptance of defective material.
4.1.2 Alternate inspection provisions.  Alternative
inspection procedures, methods or equipment (including tool
inspection, statistical process control, substitute sampling
plans, etc.) may be used by the contractor when they provide, as a
minimum the level of quality assurance required by the provisions
specified herein.  Prior to applying such alternative inspection
procedures, methods or equipment, the contractor shall describe
them in a written proposal submitted to the Procuring Contracting
Officer for evaluation and approval by the Government.  When
required, the contractor shall demonstrate that the effectiveness
of the proposed alternative(s) is equal to or better than the
quality assurance provisions herein. In cases of dispute as to
whether certain procedures of the contractor's proposed
alternative(s) provide equal assurance the provisions of this
specification shall apply.
4.2 Classification of inspections.  The following types of
inspection shall be conducted on this item:
First article inspection
a.
b.
Quality conformance inspection
4.3 First article inspection.
4.3.1 Submission.  The contractor shall submit a first article
sample as designated by the Contracting officer for evaluation in
accordance with the provisions of 4.3.2.  The first article sample
shall consist of the following items as required per Table I,
quantities are as follows:
Quantity
Drawings
Part description
10
9392366
Body, prior to obturating band groove
9392366
10
Body, before paint
30
9395680
Projectile, 60MM WP, XM722 - Assembly
See MIL-A-48078 and Table I
4.3.2 Inspections to be performed.
specified herein.
See MIL-A-48078.
4.3.3 Rejection.
5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business