Click here to make tpub.com your Home Page

Page Title: Acquisition Requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-P-70995(AR)
whether it is still taut and retracts against the item when drawn away
and quickly released.
PACKAGING.
5.
5.1 Preservation,  packaging  packing,  and  marking.  Control
panels shall be preserved, unit packaged, packed, and marked in ac-
cordance with the requirements of Packaging Data Sheet P11699332 for
the level of protection specified (see 6.2). Each packaged control
panel shall withstand the packaging tests of 4.5.8.
NOTES
6.
(This section contains information of a general or explanatory na-
ture that may be helpful, but is not mandatory.)
6.1 Intended  use.  This  specification  covers  the  assembling,
testing, and packing for one type of control panel for use on the M21
Helicopter  Armament  Subsystem-
Acquisition
documents
should
6.2 Acquisition  Requirements.
specify the following:
a.
Title,number and date of this specification.
b.
Lists of drawings and specifications pertinent to the
control panel showing applicable revision dates.
c.
inspection criteria for components (see 4.5).
d.
Index of inspection equipment lists pertinent to the
control panel, showing applicable revision dates.
That packages opened for examination shall be repackaged by
e.
s
the  contractor  at  the  contractor expense.
Disposition of reliability and vibration tested control
f.
panels (see 4.5.7.2 and 4.5.8).
Number and list of parts required and shipping instructions
g.
for production samples.
h.
Selection of applicable levels of preservation, packaging,
and packing.
Packaging instructions for repair parts.
i.
Place of final inspection and acceptance (see "Notes" in
j.
MIL-W-13855) .
k.
List of acceptance inspection equipment to be furnished the
contractor and responsibilities for other Government
property to be furnished the contractor.
Quantity, shipping instructions, and test procedures for
l.
control panels parts when an interplant interchangeability
test is reguired.
procedures and methods for demilitarizing and disposing of
m.
rejected material.
n.
Disposition of Government furnished property.
6.3 Testing agency.  When action by a testing agency is required,
work programing will be effected with the testing agency at the ear-
liest practicable date.
17

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business