Click here to make tpub.com your Home Page

Page Title: Shock. ready condition
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-P-82442(OS)
3.4.2
Acceleration,  ready condition.  The pump, mounted as shown
in Figure 1, shall be capable of meeting the performance requirements after
being subjected, in the ready condition, to the accelerations defined in
Table II for a duration of 1 minute for each magnitude.  Acceleration is
defined in 6.3.5.
TABLE II
ACCELERATION SCHEDULE
3.4.3
Shock. ready condition.  The pump, mounted as shown in Figure 1,
shall be capable of meeting the performance requirements after being
subjected, in the ready condition, to the shock loads defined in Table III.
Shock is defined in 6.3.6.
TABLE XII
SHOCK SCHEDULE
Temperature and humidity.
3.4.4
4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business