| MIL-P-82442(OS)
4.3.3
Examination of first echelon repair parts. The sampling
plans and procedures set forth in MIL-STD-105 shall be used in the
determination of acceptability of first echelon repair parts for the
pump as specified in 4.7 through 4.7.4.
4.4
Preproduction
inspection.
4.4.1
Tests and examinations. The preproduction sample of 3
pumps shall be subjected to the acceptance tests defined in 4.5.4.1 and
4.5.4.2 and subsequently shall be inspected in accordance with Table IV,
with 1 pump being tested in accordance with each of the 3 test sequences,
A through C.
TABLE IV
PREPRODUCTION TEST SEQUENCE
4.4.2
Test conditions. Unless otherwise specified, the pump shall
be subjected to the tests in 4.4.1 under the following conditions:
a.
Temperature:
Room ambient +32 F to +98 F
b.
Altitude:
Normal ground atmospheric pressure
c.
Vibration:
None
d.
Humidity:
Room ambient
4.4.3
Test equipment and set-up. In addition to the items listed in
4,5,3, test equipment is required which provides the following characteristics: