Click here to make tpub.com your Home Page

Page Title: Physical property sampling
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-P-82691A(DS)
d.
Quality
acceptance
test
facility
(see
4.1)
Inspect Ion conditions (see 4.3)
e.
First  article  test
facility
and
any
additional
tests
(see
f.
4.4 and 4.4.2)
Sampling plans for acceptance tests (see 4.5. 1.1, 4.3.1.2, 6.4
9"
and 6.5)
h.
Maximum
lot
(see 4.5.2)
size
Any
i.
special packaging l nd packing (see 5.1)
Any
special
marking
(see
5.2)
J.
Safety
precautions
(see
6.7)
k. l
6.3  First  article.
When  a  first  article  inspection  is  required,
the  contracting  officer  should  provide  specific  guidance  to  offe-
rors  whether  the  items  should  be  a  preproduction  sample,
a first
article  sample,
a  first  production  item,
a  sample  selected  from
the
first  production  items,
a  standard  production  item  from  the
contractor 's current  inventory  (see 3.2),  and the number of items
tested
to  be
A  first  article  sample  is
as specified in 4.4.
required from each supplier who has not produced the Mk 30 Mod 1,
2, 3 and 4.  If igniter grain  production  has  been  interrupted  for
more
than 6 months or changes are requested in
met-
production
hods,  a
first  article  sample  may  be  required.
The  contracting
officer  should  also  include  specific  instructions  in
acquisition
documents
regarding  arrangements  for  examinations,
approval  of
first
article  test  results,
articles.
and  disposition  of  first
Invitations
for  bids  should  provide  that  the  Government  reserves
the right to  waive  the  requirement  for  samples  for  first
article
has  been
inspection
to
those  bidders  offering  a  product  which
previously acquired  or  test ed by the Government, and that bidders
offering
such  products.
who wish to  rely  on  such  production  or
test ,
must
furnish  evidence  with  the  bid  that  prior
Government
approval  is  presently  appropriate for  the  pending  contract.
Bid-
ders  should  not  submit  alternate  bids  unless  specifically  reques-
ted to do so in the solicitation.
6.4
Physical  property  sampling.  In  the  past
for
sampling
conformance  to  the  requirements  of  3.4  has  been  based  on  MIL-STD-
105,  inspection  level  S-2,  single  sampling,  normal  inspection
AQL of 1.3 percent (see 4.3.1.1).
with an
for
6.5  Ballistic  properties  sampling.  In
sampling
the past,
ballistic
MIL-STD-414 ,
testing  was  performed  in  accordance  with
inspection  level  1,  normal  inspection, single  specification  limit
Table B1,  and an AQL of 4.0 percent (see 4.5.1.2).
6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business