| 
 | ||||||||||
| 
 |  MIL-R-19046D(OS) 4.4 Preproduction and periodic production inspection. The preproduc- tion and periodic production samples, after satisfactorily passing the quality conformance inspections detailed in 4.5, shall be subjected to the following tests and examinations, Certified inspection data covering the results of preproduction and periodic production inspec- tions shall be forwarded to the procuring activity. 4.4.1 Vibration 4.4.1.1 Mounting.  The firing relay panel, less pack and packaging, shall be mounted rigidly, secured with the mounting base horizontal to a vibration device, using the four mounting holes in the base and tested as specified in 4.4.1.2 and 4.4.1.3. 4.4.1.2 Vibration, nonoperating.  The firing relay panel shall be subjected to the "Vibration, nonoperating" test of MIL-E-82590 and thereafter shall meet the requirements of 3.4.1.1. 4.4.1.3 Vibration, operating.  The firing relay panel shall be sub- jected to the "Vibration, operating" test of MIL-E-82590 and during and thereafter shall meet the requirements of 3.4.1.2. 4.4.1.4 Vibration, transportation.  The firing relay panel shall be subjected to the "Vibration, transportation" test of MIL-E-82590 and thereafter shall meet the requirements of 3.4.1.3. 4.4.2 Shock, transportation.  The firing relay panel shall be sub- jected to the "Shock, transportation" test of MIL-E-82590 and there- after shall meet the requirements of 3.4.2. 4.4.3 Temperature and humidity 4.4.3.l High temperature and humidity, nonoperating. The firing relay panel shall be subjected to the "High temperature and humidity, nonoperating" test of MIL-E-82590 and thereafter shall meet the re- quirements of 3.4.3.1. 4.4.3.2 High temperature, operating.  The firing relay panel shall be subjected to the "High temperature, operating" test of MIL-E-82590 and, while at the test temperature, shall meet the requirements of 3.4.3.2. 4.4.3.3 Low temperature, nonoperating.  The firing relay panel shall be subjected to the "Low temperature, nonoperating" test of MIL-E-82590 and thereafter shall meet the requirements of 3.4.3.3. 4.4.3.4 Low temperature, operating. The firing relay panel shall be subjected to the "Low temperature, operating" test of MIL-E-82590 and, while at the test temperature, shall meet the requirements of 3.4.3.4. 7 | 
| 
 Privacy Statement - Press Release - Copyright Information. - Contact Us |