Click here to make tpub.com your Home Page

Page Title: Preproduction and periodic production inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-R-19046D(OS)
4.4 Preproduction and periodic production inspection. The preproduc-
tion and periodic production samples, after satisfactorily passing the
quality conformance inspections detailed in 4.5, shall be subjected to
the following tests and examinations, Certified inspection data
covering the results of preproduction and periodic production inspec-
tions shall be forwarded to the procuring activity.
4.4.1 Vibration
4.4.1.1 Mounting.  The firing relay panel, less pack and packaging,
shall be mounted rigidly, secured with the mounting base horizontal to
a vibration device, using the four mounting holes in the base and tested
as specified in 4.4.1.2 and 4.4.1.3.
4.4.1.2 Vibration, nonoperating.  The firing relay panel shall be
subjected to the "Vibration, nonoperating" test of MIL-E-82590 and
thereafter shall meet the requirements of 3.4.1.1.
4.4.1.3 Vibration, operating.  The firing relay panel shall be sub-
jected to the "Vibration, operating" test of MIL-E-82590 and during and
thereafter shall meet the requirements of 3.4.1.2.
4.4.1.4 Vibration, transportation.  The firing relay panel shall be
subjected to the "Vibration, transportation" test of MIL-E-82590 and
thereafter shall meet the requirements of 3.4.1.3.
4.4.2 Shock, transportation.  The firing relay panel shall be sub-
jected to the "Shock, transportation" test of MIL-E-82590 and there-
after shall meet the requirements of 3.4.2.
4.4.3 Temperature and humidity
4.4.3.l High temperature and humidity, nonoperating. The firing
relay panel shall be subjected to the "High temperature and humidity,
nonoperating" test of MIL-E-82590 and thereafter shall meet the re-
quirements of 3.4.3.1.
4.4.3.2 High temperature, operating.  The firing relay panel shall
be subjected to the "High temperature, operating" test of MIL-E-82590
and, while at the test temperature, shall meet the requirements of
3.4.3.2.
4.4.3.3 Low temperature, nonoperating.  The firing relay panel shall
be subjected to the "Low temperature, nonoperating" test of MIL-E-82590
and thereafter shall meet the requirements of 3.4.3.3.
4.4.3.4 Low temperature, operating. The firing relay panel shall be
subjected to the "Low temperature, operating" test of MIL-E-82590 and,
while at the test temperature, shall meet the requirements of 3.4.3.4.
7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business