Click here to make tpub.com your Home Page

Page Title: Sub-contracted material and parts
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-R-2U14D(SH)
acquired or tested by the Government, and that bidders offering such products, who
wish to rely on such production or test, must furnish evidence with the bid that
prior Government approval is presently appropriate for the pending contract.
Bidders should not submit alternate bids unless specifically requested to do so in
the solicitation.
6.5 sub-contracted material and parts .  The packaging requirements of
referenced documents listed in section 2 & not apply when material and parts are
acquired by the contractor for incorporation into the equipment and lose their
separate identity when the equipment is shipped.
The contracting officer should arrange to
erty .
6.6
loan the property listed in 3.15.
6.7
Acceptance
Table
VII
Provide'
the
classification of defects.
6.7.1  Visual and dimensional examination  The acceptable quality level
(AQL) for major defects is 1.5 and for minor defects 2.5.
The AQL is 1.5 percent.
6.7.2
Quality conformance
The Part Identifying Number for the
6.8  Part  Identify  Num b er (PIN) .
hose reels and hose guides covered by this specification shall consist of the
letter "M", the basic number of this specification and the coded numbers or
letters as shown in the following examples.
Hose Reel
Basic number of specification
Equipment Group
Equipment Type
Hose Guide
Basic number of specification
Equipment Group
Equipment Type

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business