Click here to make tpub.com your Home Page

Page Title: System interruption
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-R-48442(MU)
a.  If upon failure analysis (to determine the cause of the mal-
function) an assignable cause (related to manufacturing process, proce-
dure, basic design weakness, etc.) is determined as the basis of the mal-
function, the malfunction will not be chargeable as a reliability failure.
However, the correction to the manufacturing process or procedure (et al)
shall be accomplished.
b.  If upon failure analysis no assignable cause is evident and
the malfunction is considered random in nature, the malfunction shall
be a "chareable" reliability failure and as such must be considered in
the above demonstration test criteria. The decisions as to chareable
reliability failure must be coordinated with the procuring activity,
Frankford Arsenl Reliability and Maintainability Engineering Branch,
SARFA-QAR.
4.6.5.3 System interruption.- A system interruption is any system
malfunction for which the regulator is operable within the limits set
forth in this specification, -but requires maintenance to correct the
malfunction. Subsequent to the reliability test, the sample systems
shall be refurbished and readied for delivery and shipment.
PREPARATION FOR DELIVERY
5.
5.1 Packaging, packing amd marking.- Packaging, packing and marking
shall be in accordance with Packaging Data Sheet (see 2.1). The level
of protection shall be as specified in the procurement document.
NOTES
6.
6.1 Intended use.- The regulator is a functional assembly of the
Passive Elbow Assembly, M35E1. The major function of this assembly is
to provide regulated voltage.
6.2 Ordering data.- Procurement documents should specify the follow-
ing:
(a) Title, number, and date of this specification.
(b) Applicable packaging data sheet number (see 2.1).
(c) Selection of applicable levels of preservation, packaging
and packing.
(d) Applicable stock number.
(e) Requirement for First Article submission.
Preparing Activity:
Custodian:
Army - MU
Army
-
MU
Project Number 1240-A580
12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business