|
| MIL-R-5757/23K
QUALIFICATION: See table II.
TABLE II. Qualification inspection and sample size.
Single submission
Group submission
36 units plus 1 open unit
M5757/23-026
36 units plus 1 open unit.
Qualification inspection,
Qualification inspection
as applicable.
as applicable.
2 units each part number.
M5757/23-042
Qualification inspection,
group I plus shock, vibration,
terminal strength, and seal 1/
M5757/23-002
2 units each part number.
M5757/23-011
Qualification inspection
M5757/23-016
table, group I
M5757/23-032
1/ Tests shall be performed in order shown.
QUALITY CONFORMANCE INSPECTION:
Group A inspection: Applicable (subgroups 2 and 3) except dielectric withstanding voltage, 5-10 seconds at 10
percent increase in dielectric strength test voltage.
Group B inspection: Applicable.
Group C inspection: Not applicable.
SUPERSESSION DATA: See table III.
TABLE III. Supersession data.
Superseded PIN
New PIN
M5757/23-
M5757/23-
026
021
027
022
028
023
029
024
030
025
036
035
Custodians:
Preparing activity:
Army - CR
DLA - CC
Navy - EC
Air Force - 11
(Project 5945-1220)
DLA - CC
Review activities:
Army - AR, AT, AV, CR4, MI
Navy - AS, MC, OS, SH
Air Force - 99
8
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |