|
| MIL-R-63993A (AR)
4.3 First article inspection.
4.3.1 Submission. The contractor shall submit a first article
sample as designated by the Contracting Officer for evaluation in
accordance with provisions of 4.3.2. The first article sample
shall consist of two hundred four (204) trimmable resistor
networks.
See Table II specified
4.3.2 Inspections to be performed.
herein.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |