|
| MIL-R-63997B(AR)
REQuIRE-
SAMPLING
INSP .
DEFECT
DEFECT
PROCEDURE
MENT
METHOD
NO.
*
100%
3.3.3.7
Manual
Forward Assist Assembly.
84.
Failure to be depressed
and return to extended
position under spring
action without binding.
100%
3.3.3.7
Manaul
Forward Assist Pawl.
85.
Failure to be depressed
and return under-spring
action without binding.
Rifle.
REASSEMBLE :
100%
3.4.1
Gage
Failure
Rifle Assemble.
86.
t o meet headspace
requirement.
Examine for defect numbers
87 throuqh 95 by cyclic
hand function of rifle
u s i n q one dummy r o u n d i n
the maqazine.
100%
3.3.3.6
Manual
Failure of ejection port
87.
cover to open when bolt
carrier is moved between
rearward and forward
position.
100%
3.3.2.4
Manual
Failure of bolt to remain
88.
rearward when bolt catch
is raised.
100%
3.3.2.4
Manual
Failure of bolt to s t r i p
89.
c a r t r i d g e f r o m m a g a z i n e-
and feed cartridge into
chamber when bolt returns
to battery when magazine
is inserted and bolt catch
is depressed.
100%
Manual
3.3.2.5
Failure of magazine to be
90.
securely retained by
rifle.
26
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |