|
| MIL-R-81939B (AS)
Identification of parts. All parts shall be marked as specified on the drawings listed in
3.4
the data list for the bomb rack being procured, or in accordance with MI L-STD-1 30, if not specified on
the drawings. The item identification and part number requirements of MI L-STD-lOO shall govern the
part number and changes thereto.
Bomb rack.
3.5
Construction. The construction of the bomb rack shall be in accordance with the
3.5.1
drawings listed in the data list for the bomb rack being procured and as specified herein (see 6.2. 1g).
performance. The bomb racks shall satisfy all performance requirements when sub-
3.6.2
jected to the following inspections in the order specified in Tables I and II.
Electromechanical Component Inspection (4.6.1 )
a.
Bomb Rack Inspection (4.6.2)
b.
c.
Functional Test (4.6.3)
Arming Mechanism (4.6.4)
d.
e.
Electric Fuze Arming (4,6.5)
Secondary Release (4.6.6)
f.
Manual Function (4.6.7a)
g.
Electrical Characteristics (4.6.7b)
h.
Lag Determination (4.6.7c)
i.
High-g Release (4.6.7d)
j.
k.
Sand (4.6.7e)
1.
Salt Spray (4.6.7f)
Vibration Test (4.6.7g)
m.
n.
Shock Test (4.6.7h)
Life Test (4.6.7i)
o.
Static Test (4.6.7j)
P.
Lock Shut Firing (4.6.8)
q.
Bomb rack hooks. The construction and inspection of the bomb rack hooks shall be in
3.6
accordance with MIL-H-85042.
3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |