MIL-R-81939B (AS)
TABLE I
FIRST ARTICLE INSPECTIONS-SCHEDULE AND SEQUENCE
SPARE UNITS
REQUIRED PER
RACK TESTED*
SAMPLE
AUXILIARY SECONDARY
TEST
UNLOCK
RELEASE
TESTS
PARAGRAPH
A
B
4.6.1
Elect mechanical Component
Inspection
Bomb Rack Inspection
4.6.2
1
1
4.6.3
Functional
2
3
Arming Mechanism
4.6.4
3
4
Electric Fuze Arming
4.6.5
4
x
4.6.7a
Manual Function
5
x
Electrical Characteristics
4.6.7b
x
2
4.6.6
6
3
Secondary Release 2
6
x
Lag Determination
4.6.7c
7
x
4.6.7d
High-g Release
3
x
5
4.6.7e
Sand
8
x
1
Salt Spray
4.6.7f
9
x
1
Vibration
4.6.7g
x
7
4.6.7h
Shock
x
6
4.6.7i
Life
10
x
x
Static
4.6.7j
8
4.6.8
Lock Shut Firing
11
x
Inspection sequence is denoted by the numbers in the sample columns. An X denotes
inspection not required.
Spare units are applicable to Type II bomb racks only. See 6.2.1f.
This requirement is applicable to all Type II bomb rack inspections with the exception of
arming mechanisms and electric fuze arming.
The auxiliary release inspection of 4.6.31 is not applicable to Type III bomb racks.