|
| MIL-R-81965A(AS)
b.
Stabilize the bomb rack at the test temperature.
c.
Ignite the M55 ignition E1ement with rated voltage. The IFOBRL shall be freed and the
auxiliary unlock assembly indicator switch shall close.
d.
Release the store by applying rated voltage to the LEMA. Measure the lag time, which must
be no greater than 100 milliseconds. The bomb rack shall be visually inspected for damage.
Only damage of the auxiliary unlock assembly is acceptable. A11ow the bomb rack to return
to room temperature and any condensation to evaporate completely. Replace the auxiliary
unlock assembly.
e.
Repeat a.
f.
Repeat b. and c.
Release the store by applying rated voltage to the MK-17 Mod O Ignition Element. Measure
g.
the lag time, which shall be no greater than 100 milliseconds. The bomb rack shall be
visually inspected for damage. Damage of the auxiliary unlock assembly and secondary
release assembly only is permitted. Allow the bomb rack to return to room temperature and
any condensation to evaporate completely. Replace the auxiliary unlock assembly and
secondary release assembly.
4.6.7
Additional tests. The bomb rack shall pass the following tests of MIL-T-7743 as
specified, except as modified herein. The arming units shall meet the requirements of 4.6.4 when they arc
required to be tested, and they shall be tested in the vertically downward direction only.
a.
Manual Operation (see 4.6.7.1)
b.
Electrical Characteristics (see 4.6.7.2)
c.
Lag Determination (see 4.6.7.3)
d.
High-g Release (see 4.6.7.4)
e.
Sand Test (see 4.6.7.5)
f.
Salt Spray (see 4.6.7.6)
Shock Test (see 4.6.7.7)
g.
h.
Vibration Test (see 4.6.7.8)
i.
Life Test (see 4.6.7.9)
Static Test (see 4.6.7.10)
j.
Manual operation, Type II bomb racks. A Type II bomb rack shall be subjected to the
4.6.7.1
following portions of the manual operation test.
a.
Travel distances test: release mechanism release point measurement.
16
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |