| MIL-R-85320(AS)
First article inspections-schedule and sequence. 1/
TABLE I.
Sample
Test
Tests
Paragraph
A
B
Ejector unit inspection
4.6.3
1
1
Functional test
4.6.4
2
2
Arming mechanism
4.6.5
3
3
Electric fuze arming 2/
4.6.6
4
4
Electrical characteristics
4.6.8a
5
x
Lag time or time of release determination
4.6.8b
5
x
icing
4.6.8c
x
6
Sand
4.6.8d
x
7
Life
4.6.7
x
8
Salt spray
-
4.6.8e
x
9
Shock
4.6.8f
6
x
Vibration
4.6.8g
7
x
Static
4.6.8h
8
x
Lock shut firing
4.6.8i
10
X
1/
Inspection sequence is denoted by the numbers in the sample columns.
An X denotes inspection not required.
2/
This inspection shall only be conducted on Type II ejector units.