| MIL-R-85323(AS)
Applicable maintenance manuals for type of bomb rack
g.
required (see 4.6.2.2).
Name and location of government representative
h.
responsible for random selection of inspection
samples (see 4.4.2).
Items of data required (see 6.3).
i.
Name and location of government approved test labora-
j.
tory.
Number and designation of impulse cartridges required
k.
for testing (see 4.6.2.2, 4.6.5.2 and 4.6.6).
Applicable schematic diagram for type bomb rack
l.
required (see 4.6.2.3).
Name and location of government activities respons-
m.
ible for supplying hanger assemblies and arming wire
assemblies (see 4.5e).
Contract provision. Contracts shall specify the follow-
6.2.2
ing provision for first article inspection.
First article. When a first article is required for in-
6.2.2.1
spection and approval (see 3.1, 4.3, 6.2 and 6.3), the contract shall
specify the following provision for first article inspection. When a
contractor is in continuous production of bomb racks from contract to
contract, consideration should be given to waive the first article in-
spections. If inspection is required, indicate:
If first article inspections are conducted at the
a.
contractor's plant or a government approved labora-
tory, an inspection report shall be forwarded to the
procuring activity for verification.
b.
That the approval of first article samples or the
waiving of the first article inspection shall not
relieve the contractor of his obligation to fulfill
all other requirements of the specification and
contract.
When this specification is
Contract data requirements.
6.3
used in a procurement which incorporates a DD Form 1423 and invokes the
provisions of 7-104.9(n) of the Armed Services Procurement Regulations,
the data requirements identified below will be developed as specified by
an approved Data Item Description (DD Form 1664) and delivered in accord-
ance with the approved Contract Data Requirements List (DD Form 1423)
25
|