|
| MIL-R-85523A(AS)
Qualification inspection (continued)
TABLE VII.
Paragraph
Inspection
Requirement
Procedure
Dust (fine sand)
3.6.13
4.8.13
Post dust 1/
Endurance
3.6.14
4.8.14
Post endurance 1/
Repeat of noise level
3.6.3
4.8.3
Repeat of outlet pressure
Dynamic pressure
3.6.2.1
4.8.2.1
Steady state pressure
3.6.2.2.1
4.8.2.2.1
Repeat of leakage
Body leakage
3.6.4.1
4.8.4.1
Demand valve leakage-outward
3.6.4.2
4.8.4.2
Oxygen Purge
3.6.17
4.8.17
Underwater
3.6.15
4.8.15
Inlet Fitting
3.6.18
4.8.18
Ozone resistance
3.6.16
4.8.16
1/ These post environmental test shall include 4.8.1.1, 4.8.2.2.2, 4.8.4.1,
and 4.8.4.2. If the regulator design incorporates a relief valve, 4.8.4.3
shall also be included.
2/ Testing shall be performed only if the regulator design incorporates a
relief valve.
TABLE VIII. First article inspection (see 4.4).
Paragraph
Inspection
Requirement
Procedure
25
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |