Click here to make tpub.com your Home Page

Page Title: Table XIII. Quality conformance verification inspection (see 4.6.1).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-R-85523A(AS)
Dynamic endurance (see 4.8.14). 1/
TABLE XII.
Test
Tidal
Flowrate
Breathing
cycles 3/
volume
Average Peak
frequency
(cycles)
(liters)
(liters/min) 2/
(cycle/min)
25,000
2.0
7.3
180
28.7
50,000
2.0
15.9
50
8.0
175,000
2.0
31.8
100
15.9
1/ This test shall be run for a total of 250,000 cycles.
2/ 70F, 14.7 pounds per square inch atmospheric (psia)
3/ A complete cycle includes the flow period during breathing simulation
inhalation and the no flow period during breathing simulator exhalation.
TABLE XIII.
Quality conformance verification inspection (see 4.6.1).
Inspection
Requirement
Test Method
Sample size
paragraph
Paragraph
Visual
Regulator
3.6.1.1
4.8.1.1
Every regulator
3.6.1.2
4.8.1.2
Every regulator
Dimensions
Overload
Outlet
3.6.5.2
4.8.5.2
Every regulator
Inlet
3.6.5.1
4.8.5.1
Every regulator
Outlet pressure
3.6.2.2.2
4.8.2.2.2
Every regulator
Steady state
3.6.3
4.8.3
Every regulator
Noise level
Leakage
Body leakage
3.6.4.1
4.8.4.1
Every regulator
3.6.4.2
4.8.4.2
Every regulator
Demand valve
leakage outward
30

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business