| MIL-R-85895(AS)
AMENDMENT 1
PAGE 14
Delete existing 6.5 in its entirety and substitute
"6.5 Subject term (key word) listing.
Fuel tanks, multiple carriage
Multiple carriage
Single carriage, 14 and 30 Inch suspension stores
Stores, 500 to 2,600 pounds"
PAGE 15
Delete existing table I in its entirety and substitute as shown
First article Inspections - schedule and sequence. 1/
"TABLE I.
Sample
Test
B
A
paragraph
Tests
1
1
4.6.1
Bomb rack InspectIon
2
2
4.6.2
Functional test
3
3
4.6.3
Arming unit
4
4
4.6.4
Electric fuze arming
x
5
4.6.5.1
Manual operation
5
6
4.6.5.2
Electrical characteristics
x
7
4.6.5.3
Electromagnetic compatibility
x
8
4.6.5.4
Lag time determination
x
9
4.6.5.5
Icing
x
6
4.6.5.6
Shock
7
x
4.6.5.7
Vibration
10
x
4.6.5.8
Sand
8
x
4.6.5.9
Temperature shock
x
11
4.6.5.10
High-g
12
x
4.6.5.11
Life
13
x
4.6.5.12
Stress corrosion
x
9
4.6.5.13
Humidity
10
x
4.6.5.14
Fungus
14
x
4.6.5.15
Lock shut firing
11
x
4.6.5.16
Static test
12
x
4.6.5.17
Salt spray/altitude
1/ Inspection sequence Is denoted by the numbers in the sample columns.
An X denotes test is not required."