Click here to make tpub.com your Home Page

Page Title: Inspection methods
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-R-8592/3
TABLE I (Cent'd)
Sample
Paragraph
Type of
Acceptance Criteria
Size
Requirement  Method
Inspection
Acceptance number
2 from
4.5.3
3.4.1
Critical
Proof load
each 1000 zero.
Rejection
or frac-  number one
tion
thereof
Total AQL of 4.0
Inspec-
4.5.2
Major
Preparation for
percent defective
tion
delivery
Level S-2
1/
1/ The sample size shall be based on the applicable size code letter cor-
responding to the specified inspection level of MIL-STD-105.
Inspection methods -
4.5
Visual examination - Every survivors sling shall be visually
4.5.1
examined for defects to determine conformance to the requirements of this
specification and MS93380.  The classification and list of defects,
II, shall be used to classify and enumerate the defects found .
TABLE II
Classification of Defects for Visual
Examination of the Survivors Sling
Minor
Critical
Marking - missing, insuf-
201 .
Any material imperfections -
1.
ficient, incorrect, illegible,
foreign matter imbedded, holes
or not permanent
or tears
Color not as specified
202.
Stitching missing, pattern not
2.
as specified, not type stitch
or thread size specified
Any component missing, malformed,
3*
fractured or otherwise damaged
4.
Backstitching missing, broken
stitches or runoff
Incorrect assembly or improper
5.
positioning of components
Faulty workmanship or other
6.
irregularities
5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business