|
| MIL-S-10522K (PA)
3.2 Assembly. - The assembly shall comply with all require-
ments specified on Drawing (dwg.) 8848602 and with all require-
ments in applicable specifications.
3.3 Moisture content
3.3.1 Moisture content of match head and whistle composi-
tions. - The moisture content of each composition at the loading
station at the time of loading shall not exceed 0.1 percent.
3.3.2 Moisture content of fuze powder. - The moisture
content of fuze powder, prior to the addition of the cellulose
nitrate camphor at the loading station at the time of loading .
shall not exceed 0.3 percent.
3.3.3 Felt, paper and chipboard. - The moisture content of
the felt, paper, and chipboard components of the simulator
assembly at the loading station at the time of loading shall not
exceed 6 percent.
3.3.4 The moisture content of the black powder at the
loading station at the time of loading shall not exceed 0.3
percent.
The extension
spring (see dwg.
8592) shall not break when stretched to
the minimum point of permanent distortion.
3.5 Functioning. - The assembly shall meet the following
requirements.
3.5.1 Normal. - The assembly shall ignite and burn with
an audible whistling sound for the required number of seconds
(see dwg. 8848599).
3.5.2 Malfunction. - The assembly shall not explode or
have any part rupture or become detached during Initiation or
burning.
3.6 Quick Leak Test. - The packed carton sealed in the
barrier bag shall show no evidence of air or water leakage.
*3.7 Workmanship. - All parts and assemblies shall be
fabricated and loaded In a thorough workmanlike manner, and
all manufacturing, processing, and assembly operations shall
3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |