Click here to make tpub.com your Home Page

Page Title: Electromagnetic compatibility
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-1123E
6.2
Ordering data. -
Procurement documents should specify the following:
(a)
Title, number, and date of this specification.
(b)
Type and name of item and size required (see 1.2).
(c)
When first article (reproduction sample) is not required
(see 3.1).
(d)
Electrical characteristics, if other than specified
(see 3.4.1).
(e)
When electromagnetic compatibility is required for Air
Force use (see 3.4.2).
Equipment manual contents and distribution (see 3.7).
(f)
When metal protective edge for scouring wheel is required
(g)
(see tables I and II).
Mounting of attachments (i.e., left to right or right to
(h)
left) for type I, size B shoe finisher and list of attach-
ments if other than in table II (see 3.10.1.3).
(i)
When women's lasts and toe plates for shoe soling press
are required (see 3.10.3.1).
When shoe patching machine is for electrical operation
(j)
(see 3.10.4 and 3.4.1).
(k)
Work space required for shoe patching machine (see 3.10.4.1).
(l)
Quantity and size of shoe lasts, if other than specified
(see 3.10.7.2).
Selection of applicable levels of preservation and packaging,
(m)
and packing (see 5.1 and 5.2).
(n)
When weather-resistant fiberboard is required for level B
pack (see 5.2.2.5.1).
6.3 The following manufacturer's item has previously met the requirements
for the shoe soling press specified in 3.10.3:
Manufacturer
Manufacturer's Part No.
Lamac Process Company
Heated, No. 57A
The above is furnished only to indicate a possible source of supply. Other
manufacturers' items which conform to the specified requirements will be
acceptable.
6.4 Electromagnetic compatibility.-  The contracting officer should
submit a copy of the Interference Control Plan, the EMI/EMC Test Plan,
and the -test report required (see 4.5.2) to the Commanding General, U. S.
Army Electronics Command, Attn:  AMSEL-RD-GF, Fort Monmouth, New Jersey,
for approval.
6.5 Preservation.-  The method of preservation referred to in 5.1.1.3
is similar to method I of MIL-P-116.
16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business