|
| MIL-A-12511G
6.5 Noise limits. When the noise level of the sprayer exceeds 85 dB(A), the
-
appropriate discussion of the noise hazard in accordance with MIL-STD-1474
(MANUALS Paragraph) must include the requirement for hearing protection, the
noise level of the sprayer, the distance from the sprayer at which 85 dB(A) will
always be met, and what operational situation or system configuration will
reduce the level to 85 dB(A).
6.6 Provisioning. The contracting officer should include provisioning
requirements for repair parts and maintenance tools as necessary (including any
special tools), and instructions on shipment of sprayers.
6.7 Recycled material. It is encouraged that recycled material be used when
practical as long as it meets the requirements of the specification (see 3.3).
6.8 Materiel deterioration prevention and control (MADPAC). The contracting
officer should consider for inclusion in all applicable invitations for bid,
requests for proposal, and contracts the following statement:
"The technical proposal shall provide assurance that all system/item parts
shall be fabricated from compatible materials, suitably finished, to provide
protection from corrosion and other forms of materiel deterioration. The
assurance shall be in the form of a finish plan, utilizing state-of-art tech-
nology, which clearly identifies the specific finish or treatment to be used on
the various components and assemblies, to provide protection against the various
forms of materiel deterioration in the applicable operating and storage environ-
ments to which they may be exposed."
Preparing activity:
Custodians:
Army - ME
Army - ME
Navy - YD
Project 3744)-0111
Air Force - 99
Review activities:
Army - MD
Navy - MS
Air Force - 84
DLA - CS
User activity:
Navy - MC
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |