MIL-S-13175H(AR)
4.4.3 Testing.  Testing is described in the First Article and
Quality Conformance Inspection tables.
4.4.4 Inspection equipment.  The inspection equipment required
to perform the examinations and tests prescribed herein are
described in the "Paragraph Reference/Inspection Method" column in
the tables starting with paragraph 4.4.2.1.  The contractor shall
submit for approval inspection equipment designs in accordance with
the terms of the contract.  See Section 6 of MIL-A-48078 and 6.3
herein.
4.5 Methods of ins pection.
4.5.1 Materials, components and processes.  Compliance with all
requirement of Section 3 of this specif ication shall be ascertained
by-current and continuing examination of inspection and test data to
determine that all components (parts, subassemblies, and materials)
have been inspected and tested and found to comply with their
respective drawing and specification requirements, and that all
specified manufacturing processes have been followed.
4.5.1.1 Visual and mechanical inspection.  The visual, manual
and mechanical inspections and tests shall verify compliance with
the requirements of Section 3 and 5 of this specification in
accordance with 4.4.2 herein and Table I.
4.5.2 Leakage.  The fuel chamber assembly, Dwg. B4-1-15, shall
be stored for a period of 4 1/2 hours in an oven at a temperature
of 155 5F.  Evidence of liquid fuel on the exterior surface
shall constitute leakage.
(See 6.5)
4.5.3  Functioning/waterproofness.  The fire starter shall be
placed horizontally in water at a temperature of 75 5F to a
depth of 6 inches measured from the top surface of the starter for a
period of 4 + 1/2 hours.  At the end of the soak period, the fire
starter shall be removed from the water and wiped dry.  Within one
hour after removal from the water the fire starter shall be
functioned as specified on the label (Dwg. D4-1-27).  During
functioning, the fire starter should be protected from drafts.
4.5.3.1 Wire breakaqe.  If the wire breaks during functioning
the fire starter may be functioned by either pulling the wire with
pliers or by igniting with a wooden match. This defect will be
reported separately from other functioning failures and evaluated
independently.
24