|
| MIL-S-1398E(AR)
2.1.3 Order of precedence. In the event of a conflict between
the text of this specification and the references cited herein, the
text of this specification shall take precedence.
REQUIREMENTS
3.
3.1 Material. Material and parts shall be in accordance with
the applicable drawings and specifications.
.
3.2 Assembly. The assembly shall comply with all requirements
specified on Drawing (dwg.) 8847462 and with all requirements
specified in applicable specifications.
.
3.3 Moisture content.
3.3.1 Star charqe composition. The moisture content of the red
star charge composition at the loading station shall not exceed 0.1
percent and the moisture content of the green and yellow star charge
compositions at the loading station shall not exceed 0.5 percent
when determined as specified in 4.5.1.1.
3.3.2 Black powder. The moisture content of the black powder,
at the loading station at the time of loading the signals, shall not
exceed 0.3 percent when determined as specified in 4.5.1.2.
3.3.3 Paper, and chipboard components. The moisture content of
the paper, and chipboard components, at the loading station at the
time of loading the signals, shall not exceed 6 Percent when
determined as specified in 4.5.1.3.
3.3.4 Polypropylene felt. The moisture content of the
polypropylene felt components, at the loading station at the time of
loading shall not exceed 0.1 percent when determined as specified in
4.5.1.3.
3.4 Transportation vibration. The signal assemblies shall
comply with the following requirements.
3.4.1 The signal assembly shall not function during the test.
3.4.2 The signal assembly shall be safe to transport followinq
the test (see 6.7).
3.4.3 There shall be no evidence of external damaqe to the
signal assembly that will affect the intended function (see 6.8).
3.4.4 There shall be no evidence of damage in the packinq or
packaging that would affect the storage life of the signal
assemblies.
3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |