4.4.3.2.1 First three (3) lots. Beginning with the first lot
produced and continuing until three (3) consecutive lots have
complied with the acceptance criteria specified, two hundred and
forty (240) signal assemblies shall be selected from each lot for
test. The lot shall be rejected if any defect as classified in
Table III occurs. The test shall be performed as specified in 4.5.2.
4.4.3.2.2 After three (3) consecutive lots. After three
consecutive lots have complied with the acceptance criteria
4.4.3.2.1, eighty (80) signal assemblies shall be selected from each
lot for test. The lot shall be rejected if any defect as classified
in Table III occurs.
4.4.3.3 Functioning. The signal assemblies shall be observed
for any evidence of failure to comply with the requirements as
classified in Table IV when tested-as specified in 4.5.3.
TABLE IV
Classification
Defect
Critical
Star color incorrect (see dwg. 8847448)
Critical
Star or tracer bursts in pistol (see 3.5.1)
Critical
Tracer color incorrect (see dwg. 8847453)
Tracer and one star ingite but second star
Critical
fails to ignite (see 3.5.7)
Major
Star burning time incorrect (see dwg. 8847448)
Tracer burning time incorrect (see dwg.
Major
8847453)
Major
Star ignition time less than min. (see 3.5.5)
Major
Primer fails to function (see 3.5.3)
Major
Signal case defect (see 3.5.2)
Major
Altitude below min. (see 3.5.6)
Major
Tracer ignition time over max. (See 3.5.4)
Tracer and star simultaneous burning time
Major
over max (see 3.5.7)