6.3.2 Contractor designs. -Contractor designs are required
for all inspection equipment for which SIE designs are not speci-
fied and may include commercial equipment which the contractor
proposes to use.  (Commercial equipment is defined as unmodified
equipment which is cataloged and available for purchase by the
general public).  Contractor designs shall include appropriate
operating Instructions, calibration procedures and maintenance
procedures.  Commercial equipment shall be fully described by
catalog listings or other means which provide sufficient infor-
mation to permit identification and evaluation by the Government
and may include illustrations and engineering data.  Designs shall
be prepared for any special fixture(s) required to be used with
commercial equipment, or with SIE designs if not otherwise covered
(per MIL-D-1OOO) specified in the Contract Data Requirements Lists
(DD Form 1423).  The contractor is referred to MIL-HDBK-204,
"Inspection Equipment Design" for guidance.  The specification
number and the applicable five digit defect code number (or
other specific identifying Information) from Section 4 of this spec-
ification shall be referenced on each contractor design together
with the component or assembly drawing number and revision letter
to which the specific design applies.
6.3.3 Submission of Designs for Approval .-Contractor designs
shall be approved by the Government prior to fabricating or pro-
curing the equipment.  Designs shall be submitted for approval to
Picatinny Arsenal, ATTN: SARPA-QA-A-M, Dover, New Jersey 07801
in accordance with the stipulations, time frame and  distribution
specified in the Contract Data Requirements List (DD Form 1423)
or in the contract The contractor must include in his sub-
mission of  designs a listing of any and all Government SIE
designs which will be utilized.  Partial submission of inspec-
tion designs is permissible and encouraged.  However, the
completion date for design review will be based on the date
of the final submission of designs.  Picatinny Arsenal design
review will normally be accomplished within one month after
receipt.
6.4 Star burning time. - The star burning time is defined
as the time from the appearance of the first colored light from
the illuminant assembly (not the first sputtering light from
the quickmatch or the black powder priming charge until the
time that the light from the star has decreased to approximately
less than 10 percent of peak brilliance.