MIL-S-17000N(SH)
ENGINEERING SERVICE REPORT
John Jones Company
Please write legibly
123 Center Street
Form No. 2
This Form Must be
Chicago, Illinois
Reproduced
Ships
Location
Call requested by
Week ending
STATEMENT OF WORK AND MATERIAL FURNISHED:
ABC Shipbuilding Co.
BB 60:
Field Change T7 was completed on
all boards. The ship is now up to date.
UB Boards: The doors and frames were secured to the deck plates and sway-brace
bar after alterations to both were accomplished. All clearances were adequate
and no binding was noted.
NOTE: THERE ARE FOUR BROKEN BACK SECTION TERMINAL STRIPS IN THE UB BOARD.
OTHER DAMAGED OR MISSING PARTS INCLUDE A SPLIT FUSEHOLDER, MISSING HARDWARE,
ETC. BECAUSE NO CONSTRUCTION SPACES HAVE BEEN PROVIDED BY CONTRACT.
SUCH CASUALTIES, ALTHOUGH MINOR IN NATURE, PRESENT PROBLEMS WHICH REQUIRE
A CONSIDERABLE AMOUNT OF TIME TO CORRECT, i.e., THE TIME REQUIRED TO PROCURE
REPLACEMENT PARTS. IT IS URGENTLY RECOMMENDED, THEREFORE, THAT A CONSTRUCTION
SPARE KIT BE SUPPLIED FOR EACH SHIP BEING BUILT.
Dressing of door cables, jumpers etc., continued on all boards.
XYZ Naval Shipyard-DD720: Relaved construction information to shipyard
personnel. The connection of ship wires to the back sections continued on all
three back sections.
NAVSEA Authority:
TIME RECORD
Totals
"M
T
w
Th
F
Sa
Su
Shift
I
Regular Hours
Overtime Hours
1
Navy Approval
THE ABOVE MATERIAL RECEIVED AND WORK PERFORMED TO MY SATISFACTION
Signed
Position
Date
Signed for
Approved for John Jones Co.
Service Representative
Date
By
By
Date
Company Distribution
Contracts (
Finance
Department Head ( )
)
(
)
This Form to be prepared in TRIPLICATE by Service Representative
SERVICE CALL
with acceptance indicated by signature of Authorized personnel.
No.
One DUPLICATE copy to be retained by the Approving Activity.
Navy Distribution
(1) NAVSEA Code 6131
(1) NAVSEA Code 613
SH 11495
FIGURE 6.
Engineering service report.
75
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |