Click here to make tpub.com your Home Page

Page Title: Ground Maintenance Subsystem Check-Out Mode
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-19557/10A(AS)
REQUIREMENTS (cent'd)
Applicable paragraphs
of MIL-S-19557C(AS)
2.
Ground Maintenance Subsystem Check-Out Mode:
Operating time - Continuous
Output Drive Speed - (59%) 15,000 rpm
output Drive Torque - 18.6 lb-ft MINIMUM
Inlet Air Total Pressure - 46 psia
Inlet Air Total Temperature - 360F
Inlet Air Flow - 122 lb/rein MAXIMUM
3. Cross Bleed Start:
Operating Time:  1 minute maximum
Inlet Air Total Pressure:  60 psia
Inlet Air Total Temperature: 11OOF
Inlet Air Flow:  142 lb/rein maximum
3.5.1
Cutout Speed:  Primary cutout speed is (60%) 15,130
100 rpm controlled by aircraft electrical system.
Secondary cutout speed is (64 1%) 16,140 250 rpm
controlled via the starter output drive speed sensor
signal fed to a remotely mounted frequency sensing
relay (FSR).
Automatic Shutoff Control:  Output drive speed sensor
3.5.7
to be provided as shown on Figures 1 and 2 for
control operation.  The speed sensor should provide
an output signal frequency of 6354 to 6556 HZ (24
tooth signal generator) at the secondary (64%)
starter cutout speed.  Minimum speed signal voltage
output shall be 3.5 volts peak to peak at output
drive speeds of 4290 rpm (17%) and above when
measured with a resistive load of 1.5K OHMS and the
speed sensor shimmed to the maximum allowable gap.
The maximum peak to peak voltage output shall not
exceed 30 volts.
Altitude:  The starter shall operate satisfactorily
3.5.8
up to and Including 25,000-ft altitude.  The starter
shall not be damaged when subjected to 75,000-ft
altitude in the overrunning mode of operation.
Attitude:  The starter shall be capable of operating
3.5.9
In any flight attitude as shown in Figure 4.
4.2.2
Inspection/Acceptance Test: Additional test
requirements are:
(1) Operate at Ground Maintenance Subsystem Check-out
conditions per para. 3.5.1 for a minimum period of 30
minutes.  During this period, conduct the following
runs:

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business