Click here to make tpub.com your Home Page

Page Title: Order of precedence
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-20517H (AR)
(Copies of specifications, standards, handbooks, drawings, and
publications required by manufacturers in connection with specific
acquisition functions should be obtained from the contracting
activity or as directed by the contracting officer.)
2.1.3 Order of precedence.  In the event of a conflict between
the text of this specification and the references cited herein, the
text of this specification shall take precedence.
REQUIREMENTS
3.
3.1 Material.  Materials and parts shall be in accordance with
applicable drawings and specifications.
3.2 Assembly.  The assembly shall comply with all requirements
specified on Drawing (dwg.) 8848486 and with all requirements
specified in applicable specifications.
3.3 Moisture content.
3.3.1 Flash charge.  The moisture content of the flash charge
at the time of loading the simulator assemblies shall not exceed 0.3
percent.
3.3.2 Fuze powder.  The moisture content of the fuze powder at
the loading station at the time of loading the fuze assemblies shall
not exceed 0.3 percent.
3.3.3 Delay composition.  The moisture content of the delay
composition at the loading station at the time of loading the fuze
assemblies shall not exceed 0.12 percent.
3.3.4 Black powder.  The moisture content of the black powder
at the time of loading the simulator assemblies shall not exceed 0.3
percent.
3.3.5 Felt and chipboard.  The moisture content of the felt and
chipboard at the time of loading the simulator assemblies shall not
exceed 6.0 percent.
3.4 Functioning.  The simulator assembly shall function in
accordance with the following requirements.
3.4.1 Case failure.  The signal case shall not split, rupture,
or bulge to the extent that it sticks in the barrel of the pistol.
3.4.2 Burst.  The charge case assembly shall not fail to burst,
or fail to burst "high order" as evidenced by a ball of smoke, a
brilliant flash, and loud report.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business