|
| MIL-S-22518A(AS)
NUMERICAL INDEX (Continued)
Section
4.5.3
Instrumentation
17
4.5.4
Initial calibration
18
No-load operation (qualification)
4.5.5
18
Burst test
4.5.5.1
18
4.5.6
No-load operation (acceptance)
19
4.5.7
Endurance test
19
Post-endurance calibration
4.5.8
19
Rated torque calibration (acceptance)
4.5.9
19
4.5.10
Overrunning
19
4.5.11
Extreme temperature operation
19
4.5.11.1
Low temperature operation
19
4.5.11.2
High temperature operation
19
4.5.12
Consecutive cycle operation
19
4.5.13
Sustained motoring
19
4.5.14
Vibration
20
4.5.15
Disengagement and reengagement test
20
4.5.16
Inverted flight test
20
4.5.17
Altitude accessory drive tests
20
4.5.18
Shear section strength
20
4.5.19
Mockup
20
4.5.20
Engine cranking tests
20
4.5.21
Teardown inspection
21
4.5.22
Rejection and retest
21
21 - 22
5.
PREPARATION FOR DELIVERY
5.1
Application
21
5.2
Preservation
21
5.3
Packaging
21
5.3.1
Level A
21
5.3.2
Level C
21
5.4
Packing
21
5.4.1
Level A
21
5.4.2
Level B
22
5.4.3
Level C
22
Marking
5.5
22
6.
NOTES
22 - 23
6.1
Intended use
22
6.2
Ordering data
22
6.3
Qualification
22
31
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |