|
| MIL-S-29772(Wep)
Level B. - (Not applicable)
5.1.2
Level C. - (Not applicable)
5.1.3
5.2
5.2.1
Level A.
5.2.2
(Not applicable)
Level B.
(Not applicable)
5.2.3
Level C.
5.3
required by contract or order, unit packages, intermediate-
packages (when used) and shipping containers shall be marked
in accordance with the requirements of MIL-STD-129.
For detailed marking instructions, see Bureau
5.3.1.1
of Naval Weapons Drawing No. 1476194.
6.
NOTES
Mod 0 is intended for use in the Switch, Delay Mark 64 Mod 0
or 1. The Hydrostatic Switch Mark 63 Mod 1 is intended for use
in the Switc h , Delay Mark 64 Mod 3.
6.2
Ordering data. - Unless otherwise specified,
procurement documents shall specify Level A packaging and
packing requirements for all shipments.
14
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |