Click here to make tpub.com your Home Page

Page Title: Use of loose-fill material
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-24660(SH)
5.4 Use of loose-fill material.
5.4.1 For all levels and commercial packing.  Unless otherwise approved
by the contracting activity (see 6.2), use of loose-fill materials for domestic
shipment and early equipment installation and commercial packaging and packing
applications such as cushioning, filler and dunnage is prohibited.  When
approved, unit packages and containers (interior and exterior) shall be marked
and labeled as follows:
"CAUTION
Contents cushioned with loose-fill material.
Not to be taken aboard ship.  Remove and discard
loose-fill material before shipboard storage. If
required, recushion with cellulosic material, bound
fiber, fiberboard or transparent flexible cellular
q aterial. "
5.4.2 For preservation and levels A, B, and C packing.  Use of loose-fill
material is prohibited for preservation and levels A, B, and C packing applica-
tions such as cushioning, filler and dunnage.
6.
NOTES
6.1 Intended use.  The sprinkler heads covered by this specification are
for use in sprinkler systems installed in q agazines with high density cargo
Ioadouts.
6.2 Ordering data.
Acquisition documents should specify the following:
(a)
Title, number, and date of this specification.
(b)
Orifice size (see 3.3 and table I).
(c)
Level of preservation and packing required (see 5.1 and 5.2).
(d)
When loose-fill material is approved (see 5.4.1).
6.3 Sub-contracted material and parts.  The packaging requirements of
referenced documents listed in section 2 do not apply when material and parts
are acquired by the contractor for incorporation into the equipment and lose
their separate identity when the equipment is shipped.
Preparing activity:
Navy - SH
(Project 4210-N199)
6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business