Click here to make tpub.com your Home Page

Page Title: Acquisition requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-3788G
6.1 Intended  use.  The shapers  covered by this specification are intended
for use in woodworking shops where molding and shaping operations are
required,
6.2 Acquisition requirements.
Acquisition
documents should specify the
following:
a.
Title, number, and date of this specification.
b.
Type and size required (see 1.2).
c.
Issue of DODISS to be cited in the solicitation and, if
required,  the specific issue of individual documents referenced
(see 2.1.1 and 2.2).
d.
First article, if required (see 3.1).
e.
System of units for measuring and indicating devices
(see 3.2.1).
f. Additional safety and health requirements, if required
(see 3.2.5).
Specify configuration of additional point-of-operation guarding,
g.
if required (see 3.2.5).
h.
Painting, if different (see 3.3.5).
i.
If electromagnetic interference control is required, specify the
equipment
and
subsystem
class
the
emission
and
and
susceptibility required (see 3.3.8).
Describe the size and shape of adapter required
j.
(see 3.4.2).
k. Drive and spindle speeds, if different (see 3.4.3).
l.
Spindle brake, if different (see 3.4.3.3).
m.
Spindle position dial, if required (see 3.4.3.4).
no
Electrical requirements, if different (see 3.4.4).
o.
Initial voltage, if different (see 3.4.4).
Motors, if different (see 3.4.4.1).
P"
Size and capacity, if different (see 3.5).
q.
12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business