|
| ![]() MIL-S-43292D
4.1.2 Responsibility for dimensional requirements. Unless otherwise
specified in the contract or purchase order, the contractor is responsible for
ensuring that all specified dimensions have been met. "When dimensions cannot be
examined on the end item, inspection shall be made at any point, or at all
points in the manufacturing process necessary to ensure compliance with all
dimensional requirements.
4.2 Classification of inspections. The inspection requirements specified
herein are classified as follows:
a. First article inspection (see 4.3).
b. Quality conformance inspection (see 4.4).
4.3 First article inspection. When a first article is required (see 3.1 and
6.3), it shall be examined for the defects specified in 4.4.2 and 4.4.3.
4.4 Quality conformance inspection. Unless otherwise specified, sampling for
inspection shall be performed in accordance with MIL-STD-105.
4.4.1 Component and material inspection. In accordance with 4.l, components
and materials shall be inspected in accordance with all the requirements of
referenced documents unless otherwise excluded, amended, modified, or qualified
in this specification or applicable purchase document.
4.4.2 End item visual examination. The end items shall be examined for the
defects listed in table I. The lot size shall be expressed in units of static
lines or connector web assemblies, as applicable. The sample unit shall be one
static line or one connector web assembly, as applicable. The inspection level
shall be II (see 6.5).
End item visual defects
TABLE I.
Classification
Major
Minor
Defect
Examine
101
Not specified type, class, or size
Materials
201
Color not as specified
Webbing, duck
Cut, hole, tear} abrasion, or
and tape
102
weak area
Ends not seared or wax dipped
202
as specified
203
Edge beaded or corded
5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |