Click here to make tpub.com your Home Page

Page Title: Ordering data.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-45152H
the contract. Release of the first vehicle for shipment prior to completion of the contract shall be
at the discretion of the local Government Quality Assurance Representative (QAR).
4.3.15 Failure. Failure of the test vehicle to meet requirements of the contract shall be cause
for the Government to refuse acceptance of all vehicles under the contract until corrective action
has been taken.
4.4 Inspection of production vehicles. The contractor's inspection system shall, as a
minimum, assure that the vehicle conforms to the physical and dimensional requirements and is
capable of meeting the performance requirements contained herein.
4.5 Wood treatment certification. Manufacturer's records, acceptable to the Government,
shall be furnished to verify that all wood requiring treatment in accordance with MIL-STD-1223
has been treated.
5. PACKAGING
5.1 Vehicle processing. The vehicle shall be processed for shipment, from manufacturer's
plant to initial receiving activity, in accordance with manufacturer's standard commercial
practice.
6. NOTES
6.1 Intended use. The vehicles covered by this specification are intended for general
nontactical use in transporting tracked and wheeled construction and material handling
equipment, other tracked and wheeled vehicles, machinery, and general cargo.
6.2 Ordering data. Acquisition documents should specify the following:
(a)
Title, number, and date of this specification.
(b)
Type, class, size, and style of semitrailer required (see 1.2).
(c)
Issue of DODISS to be cited in the solicitation and, if required, the specific issue of
individual documents referenced (see 2.1.1 and 2.2).
(d)
Identification of the appropriate service for painting and marking (see 3.1.1.1
and 3.1.1.2).
(e)
Rustproofing, if required (see 3.1.1.3).
(f)
Lifting and tiedown attachments, if required (see 3.1.1.6).
(g)
Lubrication chart, if required (see 3.1.1.7).
(h)
Whether 25 or 40 foot level load space is required for type V level deck extended
semitrailer (see 3.5(a)).
(i)
Frame strength at 33 percent of yield strength, if required ( see 3.6).
(j)
Platform extension (beavertail), if required (see 3.7.5).
33

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business