Click here to make tpub.com your Home Page

Page Title: Materials, construction and design.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-45921A(AR)
2.2 Order  of precedence.
In the event of a conflict between
the text of this document and the references cited herein, the
text of this document takes precedence.  Nothing  in  this  document,
however, supersedes applicable laws and regulations unless a
specific exemption has been obtained.
3.
REQUIREMENTS
3.1  First article sample.  Requirements for submission of
the first article sample shall be as specified in the contract,
(see 6.1).  The first article sample shall include the pilot pack
(see 5.1).
3.2 Materials,  construction  and  design.
Stock assemblies
without butt plates shall conform to the materials, construction
and design requirements specified herein, on Drawing F11686427 and
drawings applicable thereto, and shall be in accordance with the
applicable  materials, construction, and design provisions of MIL-
W-13855.
Slotted machine screws, square plain nuts, and nut
retainers shall conform to Drawings B7791267, A7791339, and
B1101O414  respectively.
The ferrule shall be cemented and crimped
3.2.1 Ferrule.
securely to the stock as specified on the applicable drawing so
that there shall be no relative movement.
3.2.2  Slinq swivel assembly.  The sling swivel assembly
shall be securely riveted to the stock as specified on the
applicable drawing so that there shall be no relative movement
except that the swivel loop shall rotate through its full range of
travel.
Set end of rivets shall be free of cracks and shall not
protrude above the .94 + 0.1 dimension.
3.2.3 Stock
(premix).
A detailed description of the
3.2.3.1  Process.
manufacturing and fabricating process and methods of control of
manufacturing variables in a form of a titled, numbered, and
dated process specification shall be prepared by the prime
contractor, or obtained by the prime contractor.  The process
specification shall be made available by the prime contractor at
the commencement of the production of material to which it
applies during the course of production for use by authorized
Government and industry representatives in the facilities of the
prime contractor, his subcontractors, or his vendors.  It shall
also be made available, on request, for review by technical
personnel of the technical agency.
3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business