Click here to make tpub.com your Home Page

Page Title: Preproduction model.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-52851(ME)
(k)
When vessel viewports are required (see 3.8.2).
(1)
When automatic air vents other than as specified are required
(see 3.8.3).
Power required for system (see 3.8.4).
(n)
Power required for electric-motor driven supply pumps (see
3.8.4).
When physical requirements other than those listed in 3.8.5 are
(o)
required.
Type of automatic oil discharge system required when other than
(P)
as specified (see 3.8.6).
Type of prefilter element required when other than as specified
(q)
(see 3.8.8).
Type of identification marking required when other than as
(r)
specified (see 3.8.9).
Type of instruction plates required when other than as
(s)
specified (see 3.8.10).
When pressure relief and check valves are not required (see
(t)
3.8.11.
When the coalescer and prefilter elements are not to be
(u)
Government-furnished (qualified products) (see 6.4), and are to
be furnished by the supplier (see 3.8.13).
When testing as specified in 4.5.2.3, 4.5.2.4, and 4.5.2.5 is
(v)
required (see 4.3.2).
When test conditions other than as specified in 4.5.2.1 are
(w)
required.
(x
When performance tests other than as specified in 4.5.2.2 are
)
required.
Level of preservation and packaging and level of packing
(Y)
required (see 5.1 and 5.2).
(z)
When Finish A strapping is required (see 5.2.1).
6.3 Preproduction model.  Any changes or deviations of production systems
from the approved preproduction model during production will be subject to
the approval of the contracting officer.  Approval of the preproduction model
will not relieve the supplier of his obligation to furnish systems conform-
ing to this specification.
6.4 Qualification.  When the systems covered by this specification
includes qualified components (coalescer and prefilter elements) (see 6.2),
the contracting officer should include the requirements of ASPR 1-1107.2(b)
in the solicitation.
6.5 Government-furnished property.  When specified (see 6.2), the con-
tracting officer should arrange to furnish the property specified in 3.8.13.
14

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business