|
| ![]() MIL-S-52986(ME)
Procurement document should specify the following:
6.2 Ordering data.
(a) Title, number and date of this specification.
(b) Type scrapers required (see 1.2).
(c) Time frame required for submission of the preproductin models (see
3.3).
(d) Technical publications required (see 3.26).
(e) Time frame for completing and submitting a Technical Information
Package (see 3.29).
(f) Men Basic Issue Items are to be furnished (see 3.31).
(g) Level of preservation and level of packing required (see 5.1 and
5.2).
6.3 Government-furnished equipment. The contracting officer should arrange
to furnish the equipment specified in 3.30.
6.4 Recycled material. It is encouraged that recycled material be used when
practical as long as it meets the requirements of the specification (see 3.5).
Preparing activity:
Custodian:
Army - ME
Army - ME
Project: 3805-A1O6
Review activity:
Army - AT
User activity:
Army - CE
20
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |