| ![]() MIL-S-55257C(CR)
First Article Inspection
TABLE I
Test
Reqt
Para
Para
Inspection
4.12
3,13
Interchangeability
4.11
3.11.4
Soldering-terminal-lug
connections
4.10
3.19
Mounting Insert
4.4
Inspection covered by
subsidiary documents
4.13
Visual and Mechanical
3.3
4.6
3.12
Electrical installation
4.9
3.17
Air tightness
4.7
3.15
Railroad transportation
4.8.1
3.16
Flat drop
4.8.2
3.16
Rotational drop
4.9
3.17
Air tightness
4.14
3.18
Interference suppression
4.13
3.23
Visual and Mechanical
4.6
3.12
Electrical installation
4,4 Inspection covered by subsidiary documents. The following
shall be inspected under the applicable subsidiary documents as part of
the inspection required by this Specification , and the inspection requir-
ement specified in the contract or purchase order.
When Required
Item
395
Finish
3.6
Marking
3.10
Welding
3.11.6
Cable Assemblies
3.18
Interference suppression
3.11.4
Solderless-terminal-lug connections
3*7
Riveting
4.5 Quality conformance inspection of equipment before packaging.
The contractor shall perform the inspection specified in 4.4 and 4.5.1
thru 4.5.3. This does not relieve the contractor of his responsibility
for performing any additional inspection which is deemed necessary to
control the quality of the product and to assure compliance with all