Click here to make tpub.com your Home Page

Page Title: Folding gooseneck.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-62549(AT)
4.7.19 Folding gooseneck. To determine conformance to 3.4.7, and 3.5.7, the gooseneck
shall be checked for proper construction and function as specified. The gooseneck on each trailer
shall be raised and lowered, coupling and uncoupling the trailer to and from the prime mover.
The gooseneck shall be checked to be free of binding during this operation and to fold flat to the
ground when lowered.
4.7.20 Intervehicular connections. To determine conformance to 3.4.14.2 and 3.4.16.3,
intervehicular connections shall be checked for specified requirements.
4.7.21 Electrical system check. To determine conformance to 3.4.16 through 3.4.16.3, the
electrical system and all components shall be checked for proper assembly, installation, function
and conformance to specified requirements. Spectrum testing is not required for this check..
4.7.21.1 Electrical system test. The electrical system shall be tested to determine
conformance to the requirements specified by 3.4.16 through 3.4.16.3.
4.7.22 Lubrication. To determine conformance to 3.11.1, and 3.12, the vehicle shall he
checked for proper lubrication as required. Lubrication fittings and lubrication data plates shall be
checked for proper installation, function, and conformance to specified requirements.
4.7.23 Rustproofing. Rustproofing shall be checked for proper application as specified
in 3.8.
4.7.24 Wood treatments. Wood shall be checked for proper treatment as specified in 3.4.8.
4.7.25 Welding. To determine conformance to 3.9, all welds shall be checked for
conformance to specified requirements.
4.7.26 Painting and marking check. To determine conformance to 3.7. 3.7,1, and 3,10
through 3,10.4, all applicable surfaces shall be checked for cleaning, treatment, priming and
painting as specified. Identification markings shall be checked for specified requirements. Top
coat polyurethane paint will be inspected in accordance with paragraphs 4.7.26.1.
4.7.26.1 Polyurethane paint inspection method. To determine conformance to 4.7.26, the
painting test specified by the contract, section C.X, shall be performed.
4.7.27 Marking check. All markings shall be check to determine conformance to the
requirements specified by 3.10 through 3.10.4.
4.7.28 Data plates check. All data plates shall be checked for installation complete data to
determine conformance to the requirement specified by 3.11.
32

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business