MIL-S-63326(AR)
new or reworked cavity for use in production (See Note 2).  The molded parts
shall carry the individual cavity identification.  As a control of each cavity
during production, the above quantity of parts from each cavity shall be
inspected for at least the defects listed in pertinent paragraphs of 4.4.2
after continuous production of each 5,000 parts or at the end of each week,
whichever occurs first.  Of the three (3) samples, one (1) sample shall be the
last part produced.  If any defective parts are found during qualification of
the cavity, the cavity producing the defective part(s) will not be used in
If any defective parts are found when inspection is performed for
production.
the control of the cavity, the cavity producing the defective part(s) shall be
removed from production.  Further, that portion of production since the last
control check shall be returned to the contractor for inspection for each
separate type of defect according to MIL-STD-105, using an AQL of 0.40 percent
for each major defect and an AQL of 0.65 percent for each minor defect.
All cavities removed from production because of some fault, may, after
reworking, be returned to production providing they pass the qualification
test specified above.  The contractor may request a change of inspection
frequency providing he presents objective evidence to the Contracting Officer
to substantiate the request.  Contractor design of gages and test equipment
required to perform the inspections listed herein shall be forwarded to
Commander, ARRADCOM, Dover, New Jersey 07801, ATTN:  DRDAR-QAT-I for approval
Prior to the start of normal production, the contractor shall
NOTE 1:
obtain approval from the procuring activity for the process
specification of molded or plastic parts submitted with the first
article in establishing a curing time, dimensionally check ten
(10) parts from each cavity at periodic intervals (e.g. every 30,
60, etc. mins.) until dimensional stability is attained. The
curing time will be from the time the part comes out of the mold
until dimensional stability is attained.  The inspection data
used in determining the curing time shall be sent to ARRADCOM,
Dover, New Jersey 07801, ATTN:  DRDAR-QAT-M.  If there is a
change in material, or in the cycle time, or if a cavity is
reworked, or a new cavity is used, a new curing time shall be
established and approved.
Those features of a part which are subsequently machined or
NOTE 2:
otherwise worked upon to meet its drawing requirements shall be
inspected in accordance with the Classification of Defects. A
list of these features shall be submitted with the first article
sample.
PREPARATION FOR DELIVERY
5.
5.1 Preservation, packaging and marking. packaging shall be in
accordance with drawing 9329608.  Extra care shall be taken in the handling
and nesting of flexible cable and MDF(s) of the S&A assemblies.
Packing and marking shall be in accordance with
5.2 Packing and marking.
Dwg. 9329607.
76