Click here to make tpub.com your Home Page

Page Title: Process control.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-63348A(AR)
Function
Target &
Accuracy Test
Firing Test
1.
Barrel and Barrel Collar
*
*
Assembly
*
Gas Tube Assembly
2.
Bolt Carrier Assembly - Carrier
3.
*
& Key
*
4.
Bolt
*
5.
Extractor
*
6.
Extractor Spring
*
7.
Ejector
*
Ejector Spring
8.
*
Firing Pin
9.
*
10.
Bolt Catch
*
11.
Bolt Catch Spring
*
12.
Sear Assembly
*
13.
Drive Spring Assembly
*
Drive Springs
14.
*
15.
Safety Selector
*
Flash Suppressor & Lockwasher
16.
*
*
17.
Upper Receiver Assembly
4.5.2.2 Process control.  The process average for total weapons
examined during one (1) shift shall not exceed the following:
Major defects - 1.0%
b.
Minor defects - 8.0%
If the process average is exceeded for any one of the defect
categories, a quantity of weapons submitted for examination during
the first half of the succeeding shift shall be reexamined for the
applicable defect category as specified in 4.5.2.2.3.
The quantity of weapons (in the sample). to be reexamined shall be in
accordance with MIL-STD-105, Level II. The quantity of weapons
tested during the prior shift shall be considered the lot size. An
AQL value shall be assigned as follows:
Major defects - 0.15%
Minor defects
b.
- 2.5%
14

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business