Click here to make tpub.com your Home Page

Page Title: Preparation For Delivery
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-70437(AR)
4.5.2.2 Varicomp initiation.  The sample spitback lead
assemblies shall be randomly selected from each lot.  The lead
shall be assembled in accordance with drawing 11834346 and
functioned as in 4.5.2.1.  A lead that fails as specified in
4.5.2.1 shall be classed defective.  The indentation depth shall
be measured using the probe specified in 4.5.2.1.
PREPARATION FOR DELIVERY
5.
5.1 Packaging, packing, marking and labeling requirements.
Packaging, packing, marking and labeling shall meet the Department
of Transporation Regulation 49 CFR 100-199 and shall be submitted
to and approved by the contracting officer prior to the initial
shipment.  No subsequent changes shall be made prior to obtaining
new approval.  Part number, lot number and description shall be
clearly marked on the top of each inner box anc carton.  The inner
packing must confine the lead during shipment.  The inner package
shall permit quick and easy removal of the lead by the user
without the packaging material contaminating the product.  the
outer packing must contain lot number, part number, nomenclature
and hazard marking information.
NOTES
6.
intended
6.1 Intended use.  The spitback lead assemblies
for use in the following fuze -
11834312
M759
30MM
Procurement documents should specifiy the
6.2 Order data.
following:
6.2.1 Title, number and date of this specification.
6.2.2 Place of inspection if not at the place of manufacture.
6.2.3 Provision for the supply, maintenance, and disposition
of mandatory test equipment for acceptance inspection process.
6.2.4  Instructions for shipment of production lot samples for
functional tests.
6.2.5 Provision for preparation for delivery if required for
indefinite storage of inter-plant shipment of the lead assemblies.
6.2.6 Requirement for contractor to provide and maintain an
inspection system in accordance with MIL-Q-9858, Quality Program
Requirements.
13

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business