Click here to make tpub.com your Home Page

Page Title: Burn In Requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-70442
(AR)
APPENDIX
B
BURN IN REQUIREMENTS
Burn in is to be applied to all deliverable systems or LRU'S.
Test Environments
Environmental exposure for the HUDS during burn in is Level F of
MIL-STD-781B.  Cycle time shall be determined by thermal survey.
Chamber temperature change shall be programmed equal to or greater
o
than 5 C per minute.  Figure 18 illustrates one cycle of the
environmental profile described below.
0
0
-54C to +71C (-65 F to 160 F)
Temperature
Temperature cycling shall be time
Temperature Cycling
to stabilize at low temperature
followed by time to stabilize at
the high temperature, plus 2
hours.
2.2G +  10% peak acceleration
Vibration
value at 30 + 5 Hz measured at
the mounting points.  The dura-
tion of vibration shall be at
least 10 minutes during each
hour of equipment operating time.
Equipment off during cooling
Equipment On-Off
Cycling
cycle and on during heating
cycle.
Specified voltage +5 -2%.
Input Voltage
A.  Nominal voltage for first 1/2
Input Voltage Cycling
of "ON" time starting at the
beginning of the heating period.
NOTE :  Voltage Cycling
will occur on the primary
Momentary  off.
B.
c.
HUDS
power
(28VDC)
only.
100% of nominal for next 1/3
of "ON" time.
D.
Momentary  off.
90% of nominal for last 1/3
E.
of "ON" time.
69

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business