| MIL-S-70454(AR)
Applicable stock number.
c.
Applicable packaging data sheet number (see 5.1).
d.
Provisions for First Article Testing.
e.
f.
Contract data requirements for submission of
inspection equipment designs conforming to Data Item Description
DI-R-1OO54. See 6.3.1.
6.3 Inspection equipment design.
6.3.1 Submission of designs for approval. Contractor designs
for final acceptance inspection shall be approved by the
Government prior to fabrication or procuring the equipment. The
contractor is referred to MIL-HDBK-204 for guidance. Submission
of design concept on inspection equipment is permissible for
tentative approval. The completion date for design review will be
based on the date of the final submission of designs and the
required delivery schedule as stipulated in the contract. Submit
designs as required to: Commander, US Army Armanent Research and
Development Center, ATTN: AMSMC-QAF-I (D), Dover, NJ 07801-5001.
When the contractor submits inspection equipment designs to the
Government for approval, he shall give the following information
in his letter of-transmittal:
The contract number.
a.
The contract item (name, model number, etc.).
b.
The designs remaining to be submitted and the
c.
expected date of submittal.
Preparing activity:
Custodian:
Army-AR
Army-AR
(Project 1240-A815)
|