|
| MIL-S-70538A (AR)
the provisions herein. Prior to applying such alternative
procedurees, methods or equipment the contractor shall describe
them in a written proposal submitted to the Government for
evaluation (see 6.4). When required, the contractor shall
demonstrate that the effectiveness of each proposed alternative
is equal to or better than the specified quality conformance
provision(s) herein. In case of dispute as to whether the
contractor's proposed alternative(s) ProvideS equiValent
assurance, the provisions of this specification shall apply. All
approved alternative provisions shall be specifically
incorporated into the contractor's quality program or inspection
system, as applicable.
10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |