|
| MIL-S-70745 (AR)
is used. Unless otherwise specified, the contractor may use
alternate or modified contractor designs of SIE when submitted in
accordance with 603.2 and 663.3 should he elect to do so.
SIE designs may consist of any of the
6.3.1 SIE
designs.
following:
Detailed drawings which completely depict all
a.
information necessary for the fabrication and use of the items on
inspection equipment =
A source control drawing or specification control as
b.
defined in DOD-STD-100.
c. An envelope drawing as defined in DOD-STD-100, which
establishes the criteria which a detailed design shall meet. When
envelope drawings are specified, the contractor shall prepare
detailed designs which comply with criteria herein.
Contractor designs are required
6.3.2 Contractor designs.
for all inspection equipment for which SIE designs are not
specified and may include commercial equipment which the
contractor proposes to use. (Commercial equipment is defined as
unmodified equipment which is cataloged and available for
purchase by general public.) Contractor designs shall include
appropriate operating instruction calibration procedures and
maintenance procedures- Commercial equipment shall be fully
described by catalog listing or together with means which provide
sufficient information to permit identification and evaluation by
the government and may include illustrations and engineering
data. Designs shall be prepared for any special fixture(s)
required to be used with commercial equipment or with SIE designs
if not covered (6.3.1.c). Designs shall be of the categorry and
form (Per DOD-D-1000) specified in the contract Data Requirements
List (DD Form 1423). This specification number and the category
number from section 4 shall be referenced on each contractor
design together with the component of assembly drawing number,
revision letter and date to which the specific design applies.
6.3.3 Submission of acceptance inspection equipment designs
for approval. Contractor designs shall be approved by the
Government prior to fabricating or procuring the equipment.
Designs shall be submitted for approval in accordance with the
stipulation, time frame and distribution specified in the Contract
Data Requirements Lists (DD Form 1423). Partial submission of
inspection equipment designs is permissible and encouraged
However, the completion date for design review will be based on
the date of the final submission of designs and the required
delivery schedule as stipulated in the contract.Contractors
designs shall be sent to AMSMC-QAF-I (D). The address will be
specified on the Contract Data Requirements List, DD Form 1423 in
15
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |